Add AI without changing the ERP.
If you heard that you have to turn over the system to use AI - there are three ways, and you can choose the lightest one.
Cost, period, and risk of three paths
It's not what you get, but what you have to endure that matters.
ERP replacement · Connector development
- Hundreds of millions to billions of won / Connectors are separate.
- From a few months to a year
- Risk of operation suspension and loss during migration
- The quotation fluctuates depending on the range.
Read-only linkage
- Standard linkage standard average 2 to 3 weeks
- No changes because we don't use operational data.
- Confirm the scope in the consultation and start.
Three ways to add AI to ERP
1 ERP replacement — This is a method of switching to the latest ERP while receiving AI functions together. It is the most fundamental, but it costs tens of millions to billions of won and takes several months to migrate data and redefine business. There is a risk that operations will be stopped or data will be lost during the transition.
2 Connector development — This is a method of creating a linkage module that connects to the AI platform while leaving the existing ERP. It is lighter than replacement, but connector development and data mapping costs are separate, and the quotation fluctuates greatly depending on the scope.
③ Read-only linkage - This is a method of reading only the necessary data from the existing ERP and overlaying query and analysis functions. Since it does not require write permissions, the operating data remains unchanged, and the scope can be narrowed to determine the period and cost in advance. This is the method we use.
Can it be used for a 20-year-old ERP?
It's okay. The key is whether you can read the data, not the year or brand of the ERP. If you can read data from Dazon, Youngrimwon, SAP, and your own developed ERP, Excel, Google Sheets, and in-house DB, it is eligible for linkage. Even if there is no latest API, you can replace it with DB query or regular file extraction.
On the contrary, the older the ERP, the more you get. This is because data has been accumulated for years, but many times it cannot be used because there are no functions such as notifications and dashboards. It is not about buying new functions, but about making existing data usable.
How is the scope of introduction determined?
In the consultation, we first check the current environment and the range of necessary functions before proceeding. The standard linkage standard establishment period is an average of 2 to 3 weeks.
If the linkage environment deviates from the standard, such as closed networks, non-standard schemas, or multiple corporations, we will first review the possibility and the necessary scope and inform you. The review is free of charge.
Frequently asked questions
Inventory Copilot, start with consultation.
If you tell us your current environment, we will review the possibility and expected range for free.
Contact us directly
If a consultation feels like too much, contact us through a channel below.
Contact via KakaoTalkCall +82-2-6269-2193- · Consultations are free. Pricing is shared after scope is confirmed.
- · Business registration and tax invoices are available.